Municipal Engineering

Shangcheng Avenue (from Xuefeng East Road to the Fourth Affiliated Hospital of Zhejiang University School of Medicine) Tunnel in Yiwu

Project Overview

Project Name Shangcheng Avenue (from Xuefeng East Road to the Fourth Affiliated Hospital of Zhejiang University School of Medicine) Tunnel in Yiwu
Construction Site Yiwu, Zhejiang
Service Type Whole Process Cost Consulting
Construction Area The total length is about 6.04 km. The budgetary estimate is RMB 5.70 billion.
Project Characteristics The urban main road criteria are adopted. Both the underground tunnel and the ground-level road are two-way six-lane. The design speed is 60 km/h. The project includes the municipal tunnel, rail transit, utility tunnel, ground-level road, bridge, etc.

Related People

Yongsheng Chen

FIDIC-certified consultin..

Jiaxi Yan

Level 1 Cost Engineer, Re..

Qi Zhang

Level 1 Cost Engineer, Re..

Chenchen Xie

Registered Consulting Eng..

Qingxiang Zheng

..

Xuan Li

Engineer...

Bingyi Shen

Senior Consultant..

Jiahui Zhu

The securities qualificat..

Yuke Pan

..

Junjie Zhao

..

Zui Tao

Analyst..